Water Department Infrastructure and Main Replacements
Lorain
Summary
A brick water main failure is causing a sinkhole at 212 W. 15th St., requiring emergency repairs. The board paused the contract to ensure a durable engineering solution is planned.
At a glance
- Total mentions
- 11
- Last 30 days
- 0
Discussed at 2 meetings in the last 60 days; most recently Oct 2, 2026.
Impact analysis
Estimated at $21,000.
Nearby residents and motorists protected from infrastructure failure and sinkholes.
Residents experiencing utility disruptions or roadway hazards near the sinkhole.
Mentions & discussions (11)
Board of Control — October 2, 2026
Various utility divisions proposed purchase orders for window installations, security camera upgrades, generator maintenance, and permit fees.
Board of Control — September 16, 2026
Lorain is expanding loan-backed funding for major water infrastructure, including water main replacements and pump station updates to combat inflationary pressures and ensure reliable water service.
Board of Control — August 26, 2026
City officials addressed an urgent $21,000 purchase order to fix a broken sanitary main causing a sinkhole on West 15th Street. Swift repairs protect neighborhood safety and prevent further damage to local infrastructure.
Board of Control — August 19, 2026
A brick water main failure is causing a sinkhole at 212 W. 15th St., requiring emergency repairs. The board paused the contract to ensure a durable engineering solution is planned.
Board of Control — August 5, 2026
A water main failure under the W. Erie Ave. bridge over Beaver Creek requires immediate emergency repairs totaling up to $600,000. City officials noted the work will be completed mostly underground with minimal impact on local traffic.
Board of Control — July 22, 2026
The city is moving forward with design and construction services for the Fulton Tower standpipe replacement and amending an existing engineering contract.
Board of Control — July 15, 2026
The board is reviewing multiple emergency infrastructure projects, including waterline replacements on W. 23rd Street and Tower Boulevard, plus vital actuator repairs at the water purification plant and pump stations. These projects ensure the city's drinking water system remains reliable and prevents dangerous chemical leaks or station flooding.
City Council Regular Meeting — July 6, 2026
Council appropriated $1 million from water cash reserves to proactively replace aging water mains ahead of upcoming road paving projects.
Board of Control — July 1, 2026
The city hired Aqualine Inc. for $10,868 to check one-third of Lorain's water lines for leaks. This routine maintenance helps prevent water waste and pipeline failures.
Board of Control — June 26, 2026
The city considered entering into a professional services agreement with HDR, Inc. for design and construction oversight of the Fulton Tower standpipe replacement project.
City Council Special Call — February 9, 2026
The city is investing millions in water main replacements, pump station construction, and sanitary sewer evaluations to improve water service and reduce flooding.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Lorain
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.